Environmental Assessments Under 7 CFR 1794.24, Proposals normally requiring an EA with scoping, a certain category of Electric Program actions require the use of a scoping process that is similar to those proposals that require an Environmental Impact Statement. The following projects and links provide Federal Register Notices and documentation for these proposals. Associated Electric Cooperative, Inc. Proposed 540-megawatt (MW) Gas-Fired Combustion Combined-Cycle Generation Unit, Chouteau II in Mayes County, Oklahoma
Basin Electric Power Cooperative, Inc. PrairieWinds - ND1 Wind Proposal, Minot ND
100 MW Simple Cycle Combustion Turbine Proposal, Culbertson, MT
Brazos Electric Power Cooperative, Inc. Jack County, TX, Generation Plant - Unit 2
Columbia Power Cooperative Association, Inc.
Decker Energy International, Inc. Hertford Renewable Energy, LLC Biomass Power Plant, Hertford County, North Carolina
Earth Resources, Inc., Plant Carl, Carnesville, GA Proposed 20 MW Power Generation Station Utilizing Chicken Litter and Woody Biomass
East Kentucky Power Cooperative, Inc. Environmental Assessment - Spurlock Station, Gilbert Units 3 and 4
Environmental Assessment - Smith to Sideview (North Clark) Electric Transmission Proposal (5/31/06 - 16.82 MB)
Proposal Change: GM-Memphis Junction EA Will Now Be Included In The Warren RECC 161 kV Transmission Line Proposal
Warren RECC 161 kV Transmission Line Proposal
Environmental Assessment for the Proposed GM - Memphis Junction Electric Transmission Proposal (6/20/06)
Smith Station Combustion Turbine (CT) Units 9 and 10 and Smith-West Garrard Transmission Line Proposal
East Texas Electric Cooperative, Inc East Texas Electric Cooperative, Inc - Warren Relocation Project - Hardin County, Cypress Peaking Power Facility Proposal
Fitzgerald Renewable Energy, LLC. Fitzgerald Renewable Energy, LLC, Biomass Power Plant, Ben Hill County, Georgia
Proposed Fox Island (Vinalhaven Island) Wind Project, Knox County, Maine
Georgia Transmission Corporation Electric Alternative Evaluation Study and Macro Corridor Study Report for the Proposed East Walton – Rockville 500 kV Transmission Line; East Walton 500/230 kV Substation; East Walton – Bostwick 230 kV Transmission Line; Bostwick 230 kV Switching Station; East Walton – Jack’s Creek 230 kV Transmission Line; and the East Walton – Bethabara #1 230 kV Transmission Line.
Thomson-Warthen 500 kV Transmission Project. Thomson Primary 500/230/115/46 kV Substation and 38.7-mile 500 kV Transmission Line to the existing Warthen 500 kV Switching Station.
Jim Moore - Sharon
Church 230 kV Transmission Line Proposal
Cliftondale 230/25 kV Substation, Cavender Drive-Cliftondale 230kV Transmission Line, and Cavender Drive 230 kV Switching Station Proposal
Bethabara 230/115 kV Transmission Proposal
Greensburg Wind Farm, Greensburg, Kiowa County, KS
KAMO Electric Cooperative, Inc Blackberry – Chouteau 345-kV Transmission Proposal
Lake and Peninsula Borough, Alaska Kokhanok Wind-Diesel Project, Alaska
Minnkota Power Cooperative, Inc. Bemidji-Grand Rapids, MN, 230 kV Transmission Line (this proposal has been elevated to an Environmental Impact Statement - the above link will take you to our EIS page)
Center to Grand Forks 345 kV Transmission Line Proposal - The
proposed Center to
PowerSouth Energy Cooperative Inc. McIntosh Power Plant - Construction of a New 360-megawatt Peaking-Load Gas-Fired Generation Facility Proposal, Andalusia, Alabama
South Mississippi Electric Power Association Southeast Greene 230:161:69 kV Substation; Microwave Tower; and 230 and 69 kV Transmission Line
Southern Maryland Electric Cooperative Holland Cliff - Hewitt Road 230 kV Transmission Line Project, Calvert and St. Mary Counties, Maryland
Tri-State Generation and Transmission Association, Inc. San Luis Valley-Calumet-Comanche Transmission Project - Huerfona, Alamosa and Pueblo Counties, CO
| |||
Home