Environmental
Impact Statements
The
following projects and links provide documentation including Federal
Register Notices for the Rural Development's utility programs Environmental Impact
Statements (all documents saved in Acrobat Portable Document Format
(PDF))
|
Associated
Electric Cooperative, Inc. |
Lincoln-Pipestone
Rural Water System |
|
Basin Electric
Power Cooperative, Inc. |
Minnkota
Electric Cooperative, Inc |
|
Central
Electric Power Cooperative, Inc. |
Oglethorpe Power
Corporation |
|
City of
Albany, Kentucky |
Seminole Electric
Cooperative, Inc. |
|
Dairyland Power
Cooperative, Inc. |
Southern
Montana Electric Cooperative, Inc |
|
East Kentucky Power
Cooperative
|
Tri-State Generation and
Transmission Association, Inc. |
|
Jackson County Lake Project, KY/KY Highlands Empowerment Zone
|
Western Farmers Electric Cooperative/Brazos Electric Power
Cooperative |
Associated Electric Cooperative, Inc.
-
Federal Register Notice of Intent to Hold Public Scoping
Meeting and Prepare an EIS (8/10/2005) (54 KB).
-
Federal Register Notice
announcing an extension of the public comment period to
October 28, 2005 (9/30/05) (53 KB).
-
Public Scoping Report (21 MB)
-
Draft
Alternative Report (August 2005) (Entire Document - 42.5 MB) (includes
Purpose and Need, Capacity Alternatives, Siting Alternatives,
and Transmission Line Macro-Corridor Analysis).
-
Section 1.0-4.0 (Executive Summary, Profile of AECI, Purpose
and Need) (225 KB)
-
Section 5.0 (Capacity Alternatives) (279 KB)
-
Section 6.0 (Siting Alternatives) (27 MB)
-
Section 7.0 (Transmission Line Macro-Corridor Analysis)
(11.2 MB)
-
Section 8.0-9.0 and Appendices (Glossary, References and
Site Photographs (550 KB)
-
Federal
Register Notice Announcing the Availability of Draft EIS and
Public Meeting , January 11, 2007
-
Draft Environmental Impact Statement (Entire Document - 393.6
MB)
(The following links allow users to download specific
sections of the Draft EIS)
-
Executive Summary (44.4 MB)
-
Section 1 – Introduction (1.8 MB)
-
Section 2 – Alternatives Including the Proposed Action
Part 1 (45.5 MB)
Part 2 (49.4 MB)
Part 3 (49.4 MB)
Part 4 (47.4 MB)
-
Section 3 – Affected Environment and Environmental
Consequences
Part 1 (35.8 MB)
Part 2 (20.2 MB)
-
Sections 4 – 10 – Cumulative Impacts through Index (318 KB)
-
Appendix A – Relevant Federal and State Environmental
Laws and Regulations (139 KB)
-
Appendix B – Acronyms and Abbreviations (60 KB)
-
Appendix C –
Project Area Monitoring and Emission Source Data
(76 KB)
-
Appendix D –
Mercury Risk Evaluation
Part 1
(2.3 MB)
Part 2
(49.7 MB)
-
Appendix E –
Hydrogeologic Investigation Report of Findings
(15.6 MB)
-
Appendix F –
Farmland Conversion Impact Rating (1.5 MB)
-
Appendix G –
Report of Wetlands Delineation
Part 1
(558 KB)
Part 2
(29.1 MB)
Part 3
(29.5 MB)
Part 4
(42.9 MB)
-
Appendix H –
Fish, Wildlife and Vegetation Resources Inventory
(5.1 MB)
-
Appendix I –
Phases 1 And 2 Cultural Resources Survey (34.9
MB)
-
Appendix J –
State Historic Preservation Officer’s Letters of
Concurrence (976 KB)
-
Appendix K –
Noise Analysis (1.9 MB)
-
Appendix L –
Federal Register Notices (121 KB)
-
Transcripts of Public Meetings to Solicit
Comments to the DEIS
-
Federal
Register Notice Announcing the Availability of Final EIS,
July 13, 2007
-
Final Environmental Impact Statement (Entire Document - 663 MB)
-
Executive Summary and Table of Contents (414KB)
-
Section 1 – Introduction (2.9 MB)
-
Section 2 – Alternatives Including the Proposed Action
Part 1 (46.3 MB)
Part 2 (50.7 MB)
Part 3 (31.8 MB)
Part 4 (33.8 MB)
-
Section 3 – Affected Environment and Environmental
Consequences
Part 1 (42.2 MB)
Part 2 (33.6 MB)
Part 3 (28.6 MB)
-
Sections 4 – Cumulative Impacts (122 KB)
-
Sections
5 – Other Required Considerations (46 KB)
-
Sections
6 – Consultation and Coordination (100 KB)
-
Sections
7 – List of Preparers and Contributors (48 KB)
-
Sections
8 – References (116 KB)
-
Sections
9 – Glossary (135 KB)
-
Sections 10
– Index (92 KB)
-
Appendix A – Relevant Federal and State Environmental
Laws and Regulations (93 KB)
-
Appendix B – Acronyms and Abbreviations (35 KB)
-
Appendix C –
Project Area Monitoring and Emission Source Data
(68 KB)
-
Appendix D –
Mercury Risk Evaluation
Part 1
(22 MB)
Part 2
(46 MB)
Part 3
(20 MB)
-
Appendix E –
Hydrogeologic Investigation Report of Findings
(16 MB)
-
Appendix F –
Farmland Conversion Impact Rating (1.5 MB)
-
Appendix G –
Report of Wetlands Delineation
Part 1
(424 KB)
Part 2
(39.8 MB)
Part 3
(30.2 MB)
Part 4
(42.5 MB)
-
Appendix H –
Fish, Wildlife and Vegetation Resources Inventory
(5.2 MB)
-
Appendix I –
Phases 1 And 2 Cultural Resources Survey (35.6
MB)
-
Appendix J –
State Historic Preservation Officer’s Letters of
Concurrence (1 MB)
-
Appendix K –
Noise Analysis (1.3 MB)
-
Appendix L –
Federal Register Notices (131 KB)
-
Appendix M –
Responses to Comments (677 KB)
-
Appendix N – Estimated NWI Wetland Impacts for Rail and
Transmission Routes
Part 1
(35.8 MB)
Part 2
(44.2 MB)
Basin Electric
Power Cooperative, Inc.
Dry Fork Station and Hughes Transmission
Line
-
Federal Register Notice
to Hold Public Scoping Meetings and Prepare an Environmental
Impact Statement (11/9/2005) (56 KB).
-
Alternative Evaluation Study (October 2005 - 8.6 MB)
-
Macro Corridor Study - Hughes Transmission Project (October
2005 - 10.5 MB)
-
Site Selection Study (October 2005 - 720 KB)
-
Draft Environmental Impact
Statement - Complete Document (August 2007 - 199 MB)
- Draft Environmental Impact
Statement - Individual Sections
-
Chapters 1-2 Introduction and Purpose and Need
(4.3 MB)
-
Chapter 3 Affected Environment (3.1 MB)
-
Chapters 4-7 Environmental Consequences; Cumulative
Impacts; List of Preparers; and References (2.1 MB)
-
Appendix A Scoping Summary Report (22.3 MB)
-
Appendix B Alternative Generation Technologies (496
KB)
-
Appendix C Soil Types (13.4 MB)
-
Appendix D Air (13.5 MB)
-
Appendix E-F Wetland Delineation Report and Weed
Management Report (2.4 MB)
-
Figure 1.1-5 Hughes Transmission Line Study Area
(4.7 MB)
-
Figure 2.1-1 Opportunities and Constraints Analyses
for Transmission Line Corridors within the Project Area
(1.4 MB)
-
Figure 2.1-2 Preliminary Transmission Line Corridors
Identified in the Project Area (5.1 MB)
-
Figure 2.1-3 Comparative Analysis of Proposed and
Alternative Transmission Line Corridors and Alignments
(5.5 MB)
-
Figure 3.7-1 Vegetative Cover Types in the Hughes
Transmission Line Study Area (22.9 MB)
-
Figure 3.8-1 Surface Ownership in the Hughes
Transmission Line Study Area (5.9 MB)
-
Figure 3.8-3 Residences within the Hughes Transmission
Line Study Area (5.4 MB)
-
Figure 3.8-4 Land Use/Land Cover within the Proposed
and Alternative Power Plant and Transmission Line Study Area
(21.8 MB)
-
Figure 3.10-1 Visual Resource Management Classes and
Key Observation Points in the Study Area (6.0 MB)
-
Figure 3.11-1 General Transportation in the Hughes
Transmission Line Study Area (5.3 MB)
-
Figure 4.10-2 Transmission Line Key Observation Points
(5.5 MB)
-
Figure 4.10-9 Proposed Transmission Line Viewshed
Analysis (31.4 MB)
-
Figure 4.10-10 Alternative Transmission Line Viewshed
Analysis (32.6 MB)
PrairieWinds Project - Brule,
Aurora, Jerald, and Tripp Counties, SD
-
Federal Register Notice
to Hold Public Scoping Meetings and Prepare an Environmental
Impact Statement (April 7, 2009 - 55 KB).
-
Scoping Report (July 23, 2009 - 22.5 MB)
- Draft Environmental Impact
Statement (January 2010)
Deer Creek Station Energy
Facility Project - Brookings County, SD
Central
Electric Power Cooperative, Inc.
City
of Albany, KY, Cagle Water Expansion Project
Dairyland Power
Cooperative, Inc.
400-MW Coal-Fired Electric
Generating Facility, Iowa
CapX 2020
Hampton-Rochester-LaCrosse 345-kV Transmission Line Proposal
East Kentucky
Power Cooperative
Jackson
County Lake Project, Kentucky/Kentucky Highlands Empowerment Zone
Lincoln-Pipestone
Rural Water, Existing System North/Lyon County Phase and Northeast
Phase Expansion
Minnkota Electric
Cooperative, Inc. - Bemidji-Grand Rapids 230 kV Line
Oglethorpe Power
Cooperative
100-MW Biomass Power Plant
Proposal
100-MW Biomass Power Plant
Proposal, Appling County, GA
-
Federal
Register Notice to Hold Public Scoping Meeting and Prepare an
Environmental Impact Statement - Appling County, GA (6/22/09 - 46 KB).
100-MW Biomass Power Plant
Proposal, Warren County, GA
-
Federal
Register Notice to Hold Public Scoping Meeting and Prepare an
Environmental Impact Statement - Warren County, GA (6/26/09 - 46 KB).
Seminole Electric
Cooperative, Inc.
Southern
Montana Electric Cooperative, Inc.
-
Federal Register Notice of Intent to Hold Public Scoping
Meeting and Prepare an EIS (9/24/2004)
(57 KB)
-
Alternative
Evaluation Study, Section 1 (10/2004) (752 KB)
-
Alternative Evaluation Study, Section 2 (10/2004) (2.55
MB)
-
System Load Forecast (10/2004) (11.3 MB)
-
Site Screening Study (10/2004) (6.6 MB)
-
Site Selection Study (10/15/2004) (9.4 MB)
-
RUS Scoping Meeting Summary of Comment (10/2004) (9.7 MB)
-
Montana Department of Environmental Quality Scoping Meeting
Materials (4/6/2005) (1.2 MB)
-
Montana Department of Environmental Quality Scoping Report
(June 2005) (6.9 MB)
-
Federal
Register Notice Announcing the Availability of Draft EIS and
Public Meeting , June 29, 2006
-
Federal
Register Notice Announcing U. S. Environmental Protection
Agency's receipt of the Draft EIS, July 3, 2006
-
Federal
Register Notice Announcing the Extension of Public Comment
Period (to August 30) and
Additional Public Meeting (Havre, MT), August 7, 2006
-
Draft Environmental Impact Statement - with appendices
(6/27/06) (47.3 MB)
-
Draft
Environmental Impact Statement - compressed file (6/27/06) (27 MB)
-
Draft Environmental Impact Statement - Individual Sections
-
Final Environmental Impact Statement - with appendices
(January 2007) (30 MB)
-
Federal
Register Notice Announcing the Availability of Final EIS,
February 9, 2007
-
Federal
Register Notice Announcing U. S. Environmental Protection
Agency's receipt of the Final EIS, February 9, 2007
-
Record of Decision, May 10, 2007 (3.6 MB)
-
Federal
Register Notice Announcing the Availability of the Record of
Decision, May 22, 2007.
Tri-State Generation and Transmission Association, Inc.
San Luis Valley-Calumet-Comanche
Transmission Project - Huerfona, Alamosa and Pueblo Counties, CO -
The agency has decided to prepare an Environmental Impact Statement
on this proposal; the original level-of-review was an Environmental
Assessment.
Western
Farmers Electric Cooperative/Brazos Electric Power Cooperative
| |